It looks like Petersburg’s commercial drive-down dock will be built by a local contractor for substantially less money than expected. Matt Lichtenstein attended Friday’s bid opening and has this report:
For mobile-friendly, downloadable audio, click here.

From left, Harbor Board Chair Mike Bangs, PND Engineer Dick Sommerville, and Harbormaster Glo Wollen discuss the results of Friday’s bid opening.